Save time and money preparing your Environmental and Occupational Health & Safety (EHS) Program Manual from scratch…start with a template! This manual is especially designed for construction industry sub-contractors who wish to have EOHS programs and improve environmental, health & safety performance. Proceed to the title link for details. The contents of this manual are as follows:
Integrated Management System Policy (A composition of quality, environmental and health & safety policies)
Introduction
Purpose
Scope
- Safety
- Construction Safety and Health Committee
- Organizational and Administrative Responsibility
- List of Safety Requirements
- Safety orientation and awareness
- Personal Protective Equipment (PPE)
- Construction safety signages
- Fire prevention and control
- Fire-fighting equipment
- First Aid Facilities and personnel
- Site transport
- Working at heights
- Work permit
- Emergency response plan
- Emergency Response Team (ERT)
- Office safety
- Toolbox Meetings
- Coordination Meetings
- Site safety inspection
- Safety trainings
- Job hazard analysis
- Hazard Identification and Risk Assessment and Control (HIRAC)
- Monthly Safety Report
- Accident/Incident Investigation and Reporting
- Response to accidents and injuries
- Health and Sanitation:
- Welfare facilities (drinking water, sanitary and washing facilities)
- Control of substances hazardous to health
- Housekeeping
- Pest control
- Health awareness and education
- Environment
- Energy conservation program
- Solid waste management program
- Hazardous waste management
- Fuel, lubricant and chemicals
- Environmental awareness and education
- Security
- Identification (ID) system
- Control of temporary facilities
- Ingress/egress procedures
- Security on construction vehicles and equipment
- Visitors to the site
- Safe work procedures
- Welding and cutting operations
- Scaffolding
- Ladders, ramps, runways, and platforms
- Hand tools and power tools
- Paint and coatings application
- Electrical wiring and apparatus
- Confined space entry
- Construction equipment
- Unfired pressure vessels / compressed gases
- Loading platform
- Appendices:
- Appendix A – Medical Emergency Response
- Appendix B – Incident Investigation and Reporting
- Appendix C – HIRAC Procedure
- Appendix D – HIRAC Registry
- Appendix E – Construction Site Safety Inspection Checklist
- Appendix F – Accident Report Form
- Appendix G – Near-miss Report Form
- Appendix H – Emergency Hotlines
Pingback: » Energy Crops Impact Environmental Quality, Review Finds